Sylfaen Bank Relay Appeal

Launched: May 2009

APPEAL CLOSED

Target: £ 30,000 (of c. £130k)
Closed: April 2010
Funds available at close: £ 28,000 inc. Gift Aid

The track on Sylfaen bank, from Sylfaen Halt over the summit towards Golfa, was relaid by the GWR in the 1920s with rail transferred from the Tanat Valley Railway. Although this length was resleepered during preservation, it was time for it to be relaid with heavier section rail. Other work would include fettling the drainage and reballasting. The cost of materials had risen dramatically since the last trackwork and it was necessary to top up the funds with an appeal to members.

Status, March 2010:
Work commenced in Nov 2009 with the old track being removed and the track bed cleared. In the process it was found necessary to renew a culvert just on the east side of the summit. New Year brought snow but, when possible, work continued with the relaying, providing a chilly antidote to seasonal excess. In early Feb, the new track was approaching the private crossing by Lower Sylfaen Farm, and the two new occupation crossings were being constructed. Rails were rejoined in March in time for the 2010 season.


Images: B Webber, A Charman, K Heywood

Facebooktwittergoogle_plusredditpinterestmailby feather

Comments are closed.